Building Research and Information Volume 24; Issue 01
Contents
The impact of R-2000 building technology on Canadian housing:
Avi Friedman, Vince Cammalleri, PP. 5-13
Measured heat losses through a real ground floor slab: H. R. Thomas, S. W. Rees, R. M. Lloyd, PP. 14-26
Factors affecting construction practices in Makkah Al-Mukkaramah, Saudi Arabia: Sadi A. Assaf, Sami Y. Barhamain
PP. 27-30
Materials control and waste on building sites: Adnan Enshassi
, PP. 31-34
Observations on the use of ground waste clay brick as a cement replacement material: S. Wild
, PP. 35-40
Use of microsilica in concrete construction: Abdulaziz A. Bubshait, Bassam M. Tahir, M. O. Jannadi
, PP. 41-49
Potential for expert systems in the assessment and repair of fire damaged buildings in India: Archana Sarkar, P. N. Godbole, S. C. Chakrabarti
, PP. 51-58
Professional architectural/engineering consultancy practices in Saudi Arabia: Sadi A. Assaf, Ahmad I. Al Musallami, Ali Shash
, PP. 59-62
Building Research and Information Volume 24; Issue 02
Contents
The introduction of the architectural scheme of York Gate (1825, Regent's Park, London) in Moscow at the beginning of the 19th century: Tatiana Ruchinskaya
, PP. 69-74
The contribution of the Scottish architect Adam Menelaws to Moscow architecture in the early 19th century: Tatiana Ruchinskaya
, PP. 75-80
FUTURE HORIZONS IN BUILDING ENVIRONMENTAL ENGINEERING: T. Derek J. Clements-Croome
, PP. 86-96
The greenhouse effect; impact upon and the role to be played by construction: David J. Edwards, Philip T. Harris, Gary D. Holt
, PP. 97-103
A computer model for the design of window shading devices: N. M. Bouchlaghem
, PP. 104-107
Factors affecting the safety of the construction industry: M. OSAMA JANNADI
, PP. 108-112
A computer-based model for optimizing the location of a single tower crane: P. Zhang, F.C. Harris, P.O. Olomolaiye
, PP. 113-123
The role of IT manager in construction process re-engineering: Heng Li
, PP. 124-127
Building Research and Information Volume 24; Issue 03
Contents
A review of building energy standards and implications for Hong Kong: Joseph C. Lam, S. C. M. Hui, PP. 131-140
Detailed simulation of heat transfer across planar evacuated glazing: P. W. Griffiths, B. Norton, P. C. Eames, S. N. G. Lo, PP. 141-147
Public owners' satisfaction with consultancy practices in Saudi Arabia: Ahmad Al Musallami, Sadi Assaf, PP. 148-151
Value engineering in public construction projects in Saudi Arabia: Sadi Assaf, Ahmad I. Al Musallami, M. Al Sughaiyer
Sadi Assaf, Ahmad I. Al Musallami, M. Al Sughaiyer, PP. 152-158
Factors effecting construction contractors' performance: Sadi A. Assaf, Abdul-Mohsen Al-Hammad, Ahmed Ubaid, PP. 159-163
Minimum cost route for a highway in heterogeneous terrain: Sabah Said Razouki, Mohammad A. Al-Zubaidi
Sabah Said Razouki, Mohammad A. Al-Zubaidi, PP. 164-169
Issues in the investigation and reporting of housing subsidence: C. J. Anumba
C. J. Anumba, PP. 170-175
Ventilator air flow measurement in new houses: M. M. Eftekhari
M. M. Eftekhari, PP. 176-182
A monitoring and controlling system in managing infrastructure projects: Adnan Enshassi
Adnan Enshassi, PP. 183-189
Building Research and Information Volume 24; Issue 04
Contents
Demonstration projects and sustainable housing: Arjen Buijs, Sacha Silvester
, PP. 195-202
Artificial neural networks and naturally ventilated buildings: Jefrey Ignatius Kindangen
. 203-208
Assessment of structure formation in fresh concrete by measurement of its electrical resistance: John Gibb Wilson, Narendra Kumar Gupta
, PP. 209-212
The influence of occupational stress on construction professionals: J. G. Gunning, E. Cooke
, PP. 213-222
Training for Palestinian engineers to face the challenges of multinational enterprises in the Gaza Strip: Adnan Enshassi
, PP. 222-227
Factors affecting the bidding behaviour of contractors in Egypt: Amr A. G. Hassanein
, PP. 228-236
A bidding decision index for construction contractors: Amr A. G. Hassanein, Zeyad H. R. Hakam
, PP. 237-244
Public versus private sector's assessment of problems facing the building maintenance industry in Saudi Arabia: A. Al-Hammad, S. Al- Mubaiyadh, T. Mahmoud
, PP. 245-254
Building Research and Information Volume 24; Issue 05
Contents
The Renaissance: the beginning of the end for implicit buildability: David Moore
David Moore, PP. 259-269
Advanced wood-frame construction details in Canada: Avi Friedman, Vince Cammalleri
Avi Friedman, Vince Cammalleri, PP. 270-278
An expert-simulation system for construction productivity forecasting: A. H. Boussabaine, A. Roy Duff
A. H. Boussabaine, A. Roy Duff, PP. 279-286
Electronic document management systems and the management of UK construction projects: David J. Edwards, Tony Shaw, Gary D. Holt
David J. Edwards, Tony Shaw, Gary D. Holt, PP. 287-292
TIME CONSTRAINTS SET BY PRIME CONTRACTORS FOR THEIR SUB-CONTRACTORS: Amr A. G. Hassanein, John W. Melin
Amr A. G. Hassanein, John W. Melin, PP. 293-301
Project managers’ perception of production problems - an Indonesian case study: Peter F. Kaming, Paul O. Olomolaiye, Gary D. Holt, Simon T. Kometa, Frank C. Harris
Peter F. Kaming, Paul O. Olomolaiye, Gary D. Holt, Simon T. Kometa, Frank C. Harris, PP. 302-310
Urban housing reform in China - policies and performance: Jean Jinghan Chen, David Wills
Jean Jinghan Chen, David Wills, PP. 311-317
Building Research and Information Volume 24; Issue 06
Contents
Ornament and function: Julio A. Morosi, Ulfilas Boldes, Jorge Colman
Julio A. Morosi, Ulfilas Boldes, Jorge Colman, PP. 323-328
Refurbishment management practices in the shipping and construction industries - lessons to be learned: Charles O. Egbu, Barbara A. Young, Victor B. Torrance
Charles O. Egbu, Barbara A. Young, Victor B. Torrance
Charles O. Egbu, Barbara A. Young, Victor B. Torrance, PP. 329-338
Construction process performance variability: focus on labor productivity: N. M. Lema, A. D. F. Price
N. M. Lema, A. D. F. Price, PP. 339-350
Cause and effect 3-D model for measuring performance in construction acceleration: a decision support system: Mireille G. Battikha, Colin H. Davidson
Mireille G. Battikha, Colin H. Davidson
Mireille G. Battikha, Colin H. Davidson, PP. 351-357
Assessment of the types of public building maintenance contracts in Saudi Arabia: Abdul-Mohsen Al-Hammad, Sadi Assaf, Tali Al-Hazmi
Abdul-Mohsen Al-Hammad, Sadi Assaf, Tali Al-Hazmi, PP. 358-362
Planning and scheduling concrete repair work - a case study: Abdulaziz A. Bubshait, Bassam M. Tahir
Abdulaziz A. Bubshait, Bassam M. Tahir
Abdulaziz A. Bubshait, Bassam M. Tahir, PP. 363-368
Experimental study of the thermal behaviour of radiant floors: Montse SaŽnchez-Romero, Pere Alavedra-Ribot
Montse SaŽnchez-Romero, Pere Alavedra-Ribot, PP. 369-373
The role of precast concrete systems in Kuwaiti housing projects: Husain Al-Khaiat, Sami M. Fereig
Husain Al-Khaiat, Sami M. Fereig, PP. 374-378
Towards quantitatively measuring the performance of construction IT systems: Heng Li
Heng Li, PP. 379-382
|